The renovation of the gymnasium included the installation of a new ceiling, new electrical system and lighting, new heating piping, new doors, and the installation of new flooring. New safety netting was installed throughout to protect the ceiling and windows from breakage.
In addition to the gym itself, the renovation included the gym teacher’s office, boys and girls locker rooms and the portion of the hallway leading to the gym.