Support for Emergency Situations Ministry-NKA
Description
The Ministry of Emergency Situations is Armenia’s 911 rapid responders. This Ministry operates units throughout Armenia. The brave rapid responders in these units respond to a variety of calls including intruders, fires and health issues. In Nerkin Karmir Aghbyur, the unit is comprised of 24 people, who work around the clock. In addition to traditional requests, these rapid responders in this border village also organize village patrols and coordinate volunteers at the time of increased border skirmishes.
The Ministry of Emergency Situations is located in a two story building near the village administrative building. Through local support, the upper floor of the building has been renovated. Support is needed to install a proper heating system throughout the building and to renovate the lower level including a changing room and fitness room. The scope of work will include installing new subflooring, tile flooring, new windows and doors, electrical and paint. In addition, the heating system will be comprised of a new boiler, and radiators throughout the building. The Ministry is prepared to help bring a gas line to the building as their local contribution.
Region
City / Village
Start Date
End Date
Thank you to all our donors, we have met our fundraising goal.
The Need
Short Term Impact
Long Term Impact
Sponsors Benefits
Mr. & Dr. Jean-Marie & Lori Atamian
New York, NY July 17, 2020Mr. & Dr. Jean-Marie & Lori Atamian
New York, NY April 19, 2019Mr. & Dr. Jean-Marie & Lori Atamian
New York, NY July 17, 2020Mr. & Dr. Jean-Marie & Lori Atamian
New York, NY April 19, 2019Work has began on both the heating system and the first floor renovation. The large first floor windows are being blocked smaller for added security from the potential of sniper fire.
With the work on the walls and ceiling completed, the crew starts the work on installing the new tile flooring.
Work on the entire inside is completed. The first floor is ready for the new gym equipment.
An awning is being installed along with a cement walkway along the front of the building.
Brand new gym equipment and fitness supplies were purchased and delivered today.